Skip to main content

First Lady Sandra Granger (centre) at the commissioning (Ministry of the Presidency photo)

June 22 2019

Source

ExxonMobil’s Liza Destiny, the first oil production vessel which will be placed in Guyana’s waters has been officially dedicated by First Lady Sandra Granger.

According to a press release from ExxonMobil, in keeping with tradition and naming protocols, the dedication is done by a female who is called the “godmother of the vessel” to bestow good luck.

In her remarks, the release said that Mrs. Granger recognized the importance of this project and industry to Guyana. “I hope this ship will bring to us, the people of Guyana not only prosperity in a physical sense but greater cohesion, greater development and of course the sustainability of our country,” she added.

The release added that ExxonMobil’s Upstream President Liam Mallon recognized the correlation between the name of the floating, production, storage and offloading (FPSO) vessel, the “Liza Destiny”, and ExxonMobil’s intent to partner with the country over the long term.

“We are committed for a long voyage. We first signed an agreement to explore for hydrocarbons in the Stabroek block in 1999, we drilled the Liza well in May 2015, and this FPSO has been designed to produce oil for decades. It will provide value to Guyana and ExxonMobil for the long term. Our destinies, therefore, have been and will continue to be linked to Guyana in the future,” he stated.

The release said that the Liza Destiny FPSO was converted from the oil tanker, “Tina”, a VLCC (Very Large Crude Carrier) built by Hyundai Heavy Industries in South Korea. The contract for its conversion was awarded to SBM in July 2017.

The naming ceremony marks the final stage for the Liza Destiny as it readies to set sail for Guyana next month.

The Liza Destiny has a production capacity up to 120,000 barrels of oil per day and an overall storage volume of 1.6 million barrels. The release said that during  normal operations, there will be at least 80 persons living and working onboard the vessel. Twenty four  Operations and Maintenance Technicians, who are currently being trained in Canada, will return in 2020 to support work on the Liza Destiny.

Replies sorted oldest to newest

Baseman posted:

But she guh only be fuss-lady for couple more months!  Are the PPP free to rename it "wuh evva she name" Ally?

This is another casualty of the illegal Coalition’s actions. ExxonMobil cannot sit and wait for Guyana to get their acts together and as a result, an illegal First Lady was the only option available for Guyana. Had the elections been properly held by March 22, 2019 and the Coalition prevailed, this same act would have been legal and proper.

FM

I don't think Exxon give a crap about political issue, they are drilling offshore anyway. the political issues may work in their interest.. as they sign away with corrupt ministers... isn't that what happens in all oil producing countries.

Guyana will be the new Nigeria. 

FM
Dave posted:

I don't think Exxon give a crap about political issue, they are drilling offshore anyway. the political issues may work in their interest.. as they sign away with corrupt ministers... isn't that what happens in all oil producing countries.

Guyana will be the new Nigeria. 

I agree. Exxon is just fine.   Let them sort out the politics, Exxon has a contract regardless of govt.  this is an internal matter 

Baseman

Add Reply

×
×
×
×
×
Link copied to your clipboard.
×
×