Skip to main content

Reply to "Nandy Park proposed as site for new bridge over Demerara River"

The engineers should say if the land when the bridge will be built, is porous or not. They won't want the bridge to float away or crumble.  The land is too soft or very loose. Lots of concrete foundations at both ends of the bridge might save it. A feasibility study might indicate how much more money they will need to complete that Project.

I appreciate any input I can have on this venture.

R
×
×
×
×
×
×