Reply to "$1.3B Fibre Optic Cable scrapped – Hughes"

"Hughes said that the lack of a feasibility study, poor planning, absence of effective project management and the use of inexperienced contractors are some of the major factors that led to the failure of this project."


 

The botched work could never be resurrected,the wasted money on this project is already forgotten by the PPPites.

Last edited by Django

×
×
×
×
×